Datos técnicos Mine I
- Place: Yamaguchi
- Area: 23,00ha
- Operation Date: July 2019
- Project status: Operating
- System type (Technology): Fixed structure
- Power Peak: 9,00 MWp
- Annual production: 10.177 MWh/year
- Tons of CO₂ avoided: 6.615 CO₂/Year
- Households supplied: 2.988
Datos técnicos Mine II
- Place: Yamaguchi
- Area: 14,00ha
- Operation Date: July 2019
- Project status: Operating
- System type (Technology): Fixed structure
- Power Peak: 5,00 MWp
- Annual production: 5.511 MWh/year
- Tons of CO₂ avoided: 3.582 CO₂/Year
- Households supplied: 1.618